Isolator Refurbishment
In accordance with the Electrical Technical Maintenance Plan:
- Every two years, the Isolating and Rail Connecting Switches should be visually inspected and operated to check the alignment of the Blade with the fixed contacts.
- Every 6-12 months, the contact faces of the fixed contact blocks and the wiping faces of the blade should be cleaned and polished with a soft cloth and the approved contact grease reapplied.
Australian Rail Technology is experience in refurbishing Isolators, in a thorough process:
- An inspection of the switch and stripping of all required parts
- Re-plating and re-tinning of all copper parts
- Replacement of all fasteners and casting parts
- Re-assembly of the switch
- All required tests performed
Electrical Components - service and spare parts
- DC Isolators
- Motorised isolators
- Mast mounted isolators
- Hinges Junction boxes
- Relay switches
- Relay power control
- Wiring looms
- Busbars
- Driver's desk equipment
- Overhead wire
- Cantenery support
- Cantilever assembly
- Inter-car jumpers
- more


