News

Core 2014

Rail Solutions Asia 2014

25k Section Insulators for QLD and NSW

Isolating Switches – Melbourne

PCMS – Pantograph

The first Pantograph (PCMS) was installed at Thornleigh 2014. Read our White Paper on PantoInspect Condition Monitoring System

Penrith Depot – 3 Position Switch Supply

ART recently supplied 7 x 1500V DC Isolating and rail Connecting, 3 position switches to the Penrith Depot, for Sydney Trains. These switches are available in many different layouts , configurations and options.